What to Expect During a Building Inspection in Perth

Top Rated
Service 2026
4.9
Google star 1Google star 2Google star 3Google star 4Google star 5
verified by Trustindex
Trustindex verified that these reviews were published on WA Building Inspections Perth's Google Business Profile. Learn more
russell from wa building inspections perth
– KEY TAKEAWAYS
  • A registered builder spends about 2 to 3 hours on site, checking the structure, roof, subfloor, wet areas, drainage and outbuildings, plus timber pests.
  • It’s a visual, non-invasive inspection to AS 4349.1. We don’t cut holes or move furniture.
  • Your photo report arrives within 24 hours and separates major defects, minor defects and safety hazards.
  • We don’t give repair quotes. Get a qualified trade to price any repairs.
  • Come for the end of the inspection so your inspector can show you the findings in person.

“I’d rather show you a defect in person than have you read about it in a report. Come for the end of the inspection if you can.”
Russell McCarthy, Registered Builder & Lead Building Inspector

What to expect during a building inspection in Perth: tiled roof inspection

Short answer: a registered builder spends around 2 to 3 hours checking the home’s structure, roof, roof space, subfloor, wet areas, site drainage and outbuildings, and inspects for timber pests and termites. At WA Building Inspections you get a photo report within 24 hours and a phone call to explain it. The inspection is visual and non-invasive, done to Australian Standard AS 4349.1. We don’t cut holes or move furniture.

Russell McCarthy here, registered builder (BP104751) and lead inspector. Here’s the whole process from booking to the phone call afterwards.

A Perth building inspection, step by step (about 2 to 3 hours on site, report within 24 hours)
StepWhat happens
1. BookOnline or by phone, as soon as your offer is accepted
2. OutsideRoof cover, walls, drainage, paving, fences, outbuildings
3. InsideEvery room, wet areas, windows, doors, floors
4. Roof space and subfloorFraming, insulation, termite signs, moisture
5. ReportPhoto report emailed to you
6. CallYour inspector walks you through the findings

Before the inspection

Book as soon as your offer is accepted. Building inspection deadlines are tight. We’ll ask for the address, the agent’s details and your contract due date. The agent or seller arranges access. You don’t need to do anything else.

On the day

We start outside: roof cover, gutters and downpipes, walls, windows, paving, fences, retaining walls and drainage. Then inside, room by room: walls, ceilings, floors, doors, windows, kitchen, bathrooms and laundry. Then the roof space, and the subfloor if there’s access.

The timber pest inspection runs through the whole visit. We use a moisture meter and, on the Advanced inspection, a thermal camera.

Feel free to come for the end of the inspection and ask as many questions as you like.

“The report tells you what we checked and what we couldn’t. No surprises about the scope.”
Russell McCarthy

What we can’t inspect

A building inspection is visual. We can’t see inside walls, under fixed floor coverings, behind furniture or stored goods, or anywhere we can’t safely get to. Those limits are written into the report, so you know exactly what was and wasn’t checked. We don’t give repair quotes either. For costs, get a trade to quote.

The report

You get a written report within 24 hours, usually the same day. It includes:

  1. A summary of major defects, minor defects and safety hazards.
  2. Photos of every defect, with where it is and why it matters.
  3. Timber pest findings, including conducive conditions.
  4. What you should do next, in plain English.

After the report

We call you to walk through it. If something serious comes up, talk to your settlement agent straight away about your building inspection condition. If it’s a question of price, the report gives you something solid to negotiate with.

Frequently asked questions

What happens during a building inspection?

A registered builder inspects the outside, inside, roof space and subfloor of the home, plus timber pests, over about 2 to 3 hours. You then receive a photo report within 24 hours and a phone call explaining the findings.

Can I attend the building inspection?

Yes. We encourage buyers to come for the last part of the inspection so the inspector can show them the findings in person. A video call is available if you can’t be there.

Does a building inspector give repair costs?

No. A building inspection report identifies and explains defects but doesn’t include repair quotes. Get a qualified trade to quote on any repairs.

What can’t a building inspector check?

Areas that can’t be seen or safely reached: inside walls, under fixed floor coverings, behind furniture or stored goods. These limits are listed in the report.

Related Reading

Written by Russell McCarthy, Registered Builder (BP104751) and Lead Building Inspector at WA Building Inspections Perth.